Skip to content

Machines and solutions for rubber and solid waste

Veiga Sul Get a quote
Veiga Sul
Get a quote +55 51 99315-9787
Biomechanical MSW processing plant
Pioneer

Hover over the machine to see the details up close

Biomechanical MSW processing plant at the factory
Real photo of the machine

Municipal solid waste (MSW)

Biomechanical MSW processing plant Municipal waste recycling

Veiga is the developer of the biomechanical processing technology for MSW (municipal solid waste): a process that separates organic from synthetic waste and turns each part into an asset, with sustainable projects designed to deliver a return. Brazil's first biomechanical plant opened in 2021 in São Bento do Sul (SC), sized for 40 tons per day. In Timbó (SC), the plant is sized for 160 tons per day.

Specifications
São Bento do Sul (SC)Plant for 40 tons per day, opened in 2021
Timbó (SC)Plant for 160 tons per day
ProcessBiomechanical separation of organic and synthetic waste

Dimensions and power vary according to the model.

  • 12-month warranty
  • NR12 compliant
  • In-house service

Partnership

Veiga Sul and 100 Lixo: integrated solutions for municipal waste recovery.

As the exclusive manufacturer of the equipment for the biomechanical waste recovery plant, Veiga Sul works in partnership with 100 Lixo to develop custom municipal waste management projects, focused on sustainability, positive social impact and economic viability.

100 Lixo is responsible for the plant's project and sales. Veiga manufactures the equipment in Novo Hamburgo (RS), Brazil.

  • A custom project for each municipality, company or partner
  • Solutions adapted to the public and private sectors
  • Equipment manufactured exclusively for biomechanical plants
  • A 360° approach: social, economic and environmental
Meet 100 Lixo

Veiga Sul 100 Lixo

The complete partnership to turn waste into resources, with technology, commitment and sustainability.

Why biomechanical?

Biomechanical plant technology is the state of the art in municipal solid waste treatment: it combines biological and mechanical processes to recover as much material as possible and generate clean energy.

The result: less waste in landfills and more value for the production chain and for society.

Environmental

Recovery and reuse of waste with biomechanical technology, reducing the impact on landfills.

Economic

Projects that deliver a financial return to public and private partners, with sustainable and scalable business models.

Social

Productive inclusion, job creation and a better quality of life in the communities served by the projects.

Plant quote

Register your municipality's project.

Each plant is sized for the reality of whoever will run it. With this information, Veiga's sales team comes to the conversation already knowing who is asking, from where, and the size of the project.

  1. You send the formWho you are, the agency or company you represent, its tax ID and the municipality.
  2. Our sales team gets back to youBy email or phone, to understand the waste volume, the site and the timeline.
  3. A tailor-made projectVeiga Sul and 100 Lixo prepare the proposal for your municipality.

Plant quote form

Your details go to the Veiga Sul sales team, to answer this form. Privacy policy

Protected by reCAPTCHA: the Google Privacy policy and Terms of Service apply.

Same line

Other machines in the urban waste line

01 / 01

Does your production need a machine that does not exist yet?

Veiga engineering develops it. 100% custom projects, with the experience of a company that has built machines and equipment since 1989.

Talk to engineering

Quote request

Tell us what you need

Which line?
Machines you are interested in you can choose more than one
Choose one or more machines

Rubber

Industrial waste

Urban waste

    Your details only go to the Veiga Sul sales team, to answer this request. Privacy policy

    Protected by reCAPTCHA: the Google Privacy policy and Terms of Service apply.

    Prefer WhatsApp? Talk directly to our sales team